Hi everybody,
I have a SNC 7.0 linked to ECC6 Ehp4 (using CIF).
PO created into ECC6 cannot be seen into SNC.
I created all the BP needed (Vendor, Location, user, internet user) and made the relationships.
I affected SAP_SCM_ICH_* roles to the user.
I create a PO for vendor 100000 Plant D201 into ECC6.
I Cannot display this PO into SNC (no data available into value helps).
Any idea.
Thks
Ludovic.